000 01373 am a2200289 a 4500
001 ocm0387197648
008 940628s1995 gw a rb 001 eng
010 _a94026685
020 _a0387197648 (New York)
020 _a3540197648 (Berlin)
029 _aT17601
040 _dOCoLC
041 1 _aeng ger
082 0 4 _a658.5
100 1 _aWiendahl, Hans-Peter.
_920491
240 1 0 _aBelastungsorientierte Fertigungssteuerung
245 1 0 _aLoad-oriented manufacturing control /
_cHans-Peter Wiendahl.
260 _aBerlin.
_aNew York :
_bSpringer-Verlag,
_c1995.
300 _axv, 368 p. :
_bill. ;
_c25 cm.
504 _aIncludes bibliographical references and index.
505 0 _aIntroduction -- Conventional production scheduling and control -- Lead time - a key term in manufacturing control -- The throughput diagram - a general, realistic model of the manufacturing process -- Analysis, monitoring and diagnosis of the manufacturing flow -- Load-oriented order release -- Schedule-oriented capacity planning and control -- Implementation of load-oriented manufacturing control -- Comparison of load-oriented manufacturing control with other methods -- Summary.
650 0 _aProduction control
_941489
650 0 _aProduction scheduling.
_942135
907 _a.b1015761x
_b161214
_c011116
942 _n0
998 _ac
_b110905
_cm
_da
_e-
_feng
_ggw
_h0
999 _c11311
_d11311