000 | 01373 am a2200289 a 4500 | ||
---|---|---|---|
001 | ocm0387197648 | ||
008 | 940628s1995 gw a rb 001 eng | ||
010 | _a94026685 | ||
020 | _a0387197648 (New York) | ||
020 | _a3540197648 (Berlin) | ||
029 | _aT17601 | ||
040 | _dOCoLC | ||
041 | 1 | _aeng ger | |
082 | 0 | 4 | _a658.5 |
100 | 1 |
_aWiendahl, Hans-Peter. _920491 |
|
240 | 1 | 0 | _aBelastungsorientierte Fertigungssteuerung |
245 | 1 | 0 |
_aLoad-oriented manufacturing control / _cHans-Peter Wiendahl. |
260 |
_aBerlin. _aNew York : _bSpringer-Verlag, _c1995. |
||
300 |
_axv, 368 p. : _bill. ; _c25 cm. |
||
504 | _aIncludes bibliographical references and index. | ||
505 | 0 | _aIntroduction -- Conventional production scheduling and control -- Lead time - a key term in manufacturing control -- The throughput diagram - a general, realistic model of the manufacturing process -- Analysis, monitoring and diagnosis of the manufacturing flow -- Load-oriented order release -- Schedule-oriented capacity planning and control -- Implementation of load-oriented manufacturing control -- Comparison of load-oriented manufacturing control with other methods -- Summary. | |
650 | 0 |
_aProduction control _941489 |
|
650 | 0 |
_aProduction scheduling. _942135 |
|
907 |
_a.b1015761x _b161214 _c011116 |
||
942 | _n0 | ||
998 |
_ac _b110905 _cm _da _e- _feng _ggw _h0 |
||
999 |
_c11311 _d11311 |