Ringaskiddy waste-to-energy facility / Arup, Indaver Ireland.
Contributor(s): Ove Arup Partnership
| Indaver Ireland.
Material type: ![materialTypeLabel](/opac-tmpl/lib/famfamfam/BK.png)
![](/opac-tmpl/bootstrap/images/filefind.png)
![](/opac-tmpl/bootstrap/images/filefind.png)
Item type | Current library | Call number | Copy number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
General Lending | MTU Bishopstown Library Lending | 333.714094195 (Browse shelf(Opens below)) | 1 | Available | 00152438 | ||
General Lending | MTU Bishopstown Library Lending | 333.714094195 (Browse shelf(Opens below)) | 1 | Available | 00152440 | ||
General Lending | MTU Bishopstown Library Lending | 333.714094195 (Browse shelf(Opens below)) | 1 | Available | 00152446 | ||
General Lending | MTU Bishopstown Library Lending | 333.714094195 (Browse shelf(Opens below)) | 1 | Available | 00152444 |
Browsing MTU Bishopstown Library shelves, Shelving location: Lending Close shelf browser (Hides shelf browser)
Vol 1: Non techical summary -- Vol 2: Main text -- Vol 3: Figures -- Vol 4: Appendices. Volume 1 -- Introduction -- The proposed waste-to-energy facility -- Planning procedure -- Environmental impact statement -- Consultation -- Need for the project -- Site selection -- Consideration of alternatives -- Construction activities -- Human beings -- Roads and traffic -- Noise and vibration -- Air quality -- Climate -- Landscape and visual assessment -- Flora and fauna -- Soils, geology, hydrology, hydrogeology and coastal recession -- Effluent generation and treatment -- Archaeology, architectural and cultural heritage -- Material assets -- Other impact headings, cumulative impacts and interactions -- Summary -- Viewing and purchasing the environmental impact statement.
-- Volume 2 -- Introduction -- Need for the scheme -- Alternatives -- Proposed site and project description -- Construction activities -- Planning and policy -- Human beings -- Roads and traffic -- Air quality assessment -- Climate -- Noise and vibration -- Landscape and visual assessment -- Flora and fauna -- Soils, geology, hydrology, hydrogeology and coastal recession -- Effluent generation and treatment -- Archaeological, architectural and cultural heritage -- Material assets -- Cumulative impacts, other impacts and interactions -- Summary of impacts and mitigation measures.
An environmental impact statement (EIS) has been prepared for Indaver for its proposed waste-to-energy facility, at Ringaskiddy in County Cork, as part of an application for planning permission. The EIS comprises four volumes.